Technical drawing numbers | |
S2166/1 | Record of amendments |
S2166/2 | Locking sketch |
S2166/3 | Mechanical locking table |
S2166/4 | Detection table |
S2166/5 | Electrical control table |
S2166/6 | Dog chart |
S2166/7 | Lever leads |
S2166/12 | Signal box diagram |
A type GW27c box opened here in 1913. The adjacent box, Morlais Junction East, which controlled the double track junction to Morlais Junction South and Hendy Junction closed in 1938. This left the junction in the block section with the facing points nearly 500 yards beyond the starting signal bracket and the trailing points as spring points protected by a sand drag.
‹‹UP Click below to move to adjacent box DOWN›› | ||
Graig Merthyr Colliery Sdg | —— This box —— | Morlais Jcn (South) Hendy Jcn |
The diagram below is a low-resolution version to indicate the content: a full-resolution 'pdf' file will be published on a CD-ROM entitled 'Great Western Railway Signal Box Diagrams - South Wales'. For availability and ordering information, click on the image below.
This page last updated on 8th October 2010.