The Great Western Railway became dissatisfield with their double twist and stud locking frames and in 1904 developed their own tappet interlocking. Within 5 years they had designed three different versions!

This paper explains the principles on which these interlockings are built and, with the use of many diagrams, how they operated.

In this paper you will also find an explanation of locking tables and dog charts and how they relate to some sample layouts.

Written by one of our members, Reg Instone, this paper is key to understanding how mechanical locking operates and the principles explained are equally valid for other railway company's tappet locking. Modellers who wish to replicate prototype signalling and use it correctly on their layouts also need an understanding of interlocking and this is an excellent primer in the subject.

This signalling paper is supplied as a photocopied booklet. Copies are created to order - we don't keep piles of them on the shelves - so there can easily be a three week gap between you ordering and the booklet dropping through your letter box. The wait will be worth it!

Need this on a different media? Contact us via the link at the bottom of the page and we'll see what we can do.

Write a review

Please login or register to review

Great Western Railway 3-bar Tappet Frame

  • Product Code: SS-SP-2-BK
  • Availability: In Stock
  • £2.40


Related Products

Principles of Tappet Interlocking

Principles of Tappet Interlocking

Interlocking is the glue that physically prevents a signalman from being able to signal two or more ..

£2.40

Great Western Railway 3-bar Tappet Frame PDF

Great Western Railway 3-bar Tappet Frame PDF

The Great Western Railway became dissatisfield with their double twist and stud locking frames and i..

£2.40

Great Western Railway 3-bar Tappet Frame ZIP

Great Western Railway 3-bar Tappet Frame ZIP

The Great Western Railway became dissatisfield with their double twist and stud locking frames and i..

£2.40

Great Western Railway 5-Bar Tappet Frame

Great Western Railway 5-Bar Tappet Frame

After twenty or so years of using tappet frames, The Great Western Railway embarked on improving fle..

£3.00

Great Western Railway Twist Frames

Great Western Railway Twist Frames

Twist frames first appeared in 1863 when the Great Western Railway's signal works at Reading strted ..

£2.40

Search Tags: Block Signalling, Frames, GWR, Mechanical, Modelling, Reference, Tappet Locking, Western